Zoning Case # Applicant Status Submitted Last Update Scheduled For BoS Meeting
PCA 92-P-001-09 Cityline Partners LLC Pending Staff Approval 5/20/2011 9/21/2011 Not Scheduled
Scotts Run Station North (3 Office Towers and 2 Residential Towers between 208′-273′). Application proposes to preserve the Scotts Run waterway and include recreational park space and trails. Application also maintains significant space away from existing garden style apartments on Scotts Run Crossing Road. No cross over or under of I495 included in plans.
FDP 2010-PR-023 Mitre Corporation Pending Staff Approval 12/22/2010 3/11/2011 Not Scheduled
Mitre 5 is a project looking to construct a new parking garage behind the current Northrup Grumman building and a new Mitre 5 office building (mid rise) within the Mitre Campus. The plan does not make significant improvements in line with the Tysons Comprehensive Plan and proposes more parking. Future road grids including Colshire Meadow Drive (not part of this project) will help connect portions of Anderson Road to the McLean metro station.
RZ   2011-HM-012 CARS-DB1, LLC Pending Staff Approval 2/1/2011 6/29/2011 Not Scheduled
Dominion Square West is part of the overall Dominion Square project along Springhill Road which proposes redeveloping the existing car dealership properties within the property into mixed use high density development. This portion of the project proposes 6 new high rise buildings ranging from 190′ to 305′ including 2 office high rises with ground floor retail and 4 high rise residential towers. The project also includes two skyparks between residential towers which provide secluded recreational space to residents. This project has direct access to the metro platform along Route 7.
RZ   2011-HM-013 CARS-DB1, LLC Pending Staff Approval 2/1/2011 6/29/2011 Not Scheduled
Dominion Square East is part of the overall Dominion Square project along Springhill Road which proposes redeveloping the existing car dealership properties within the property into mixed use high density development. This portion of the project proposes 6 new high rise buildings ranging from 190′ to 255′ including 4 office high rises with ground floor retail, 1 hotel, and 1 residential high rise. The project also includes three skyparks between residential towers which provide secluded recreational space to residents. The project also includes a common civic plaza called dominion square near the center of the project away from Route 7.
RZ   2011-HM-026 Q-R Spring Hill LLC Pending Staff Approval 7/19/2011 9/21/2011 Not Scheduled
Perseus at Spring Hill Metro is located on the pie shaped property between Springhill Road and Route 7 directly adjacent to the Tysons West metro station. The project proposes two new high rise buildings including a 360′ office, hotel, retail high rise and a 240′ residential/retail high rise. It also includes the construction of road grid connections on the south side of route 7 and the provision of two new public parks totaling 1 acre.
RZ   2011-HM-027 1587 Springhill Holdings Pending Staff Approval 7/19/2011 9/21/2011 Not Scheduled
Sunburst at Spring Hill Metro is located directly behind the Perseus development between Springhill Road and Route 7 directly and adjacent to the Tysons West metro station. The project proposes three new high rise buildings including a 155′ residential tower and two office towers of 165′ adnd 255′. It also includes the construction of road grid connections on the south side of route 7 including part of the Boone Boulevard extension to Springhill and the provision of one new public park totaling 1.5 acre.
RZ   2011-HM-032 Tysons West Residential Pending Staff Approval 7/7/2011 12/8/2011 Not Scheduled
Promenade at Tysons West is a mixed use multi-phase project which currently has one piece under construction by right to construct a retail center including a wal-mart and retail stores. The remainder of the site is currently under rezoning consideration and includes 4 new mixed use high rise and mid rise residential and office buildings ranging from 75′ residential mid rise to 225′ residential and office towers. The project also includes several open space improvements including 2 plazas, a linear park, and a full recreational park.
RZ   2011-PR-005 NV Commercial and Clydes Pending Staff Approval 3/17/2011 4/12/2012 Not Scheduled
Tysons Central is a mixed use project located at the heart of Tysons between Route 123 and Route 7 along what is currently a service road to the existing 1 and 2 story retail spaces. The proposed project includes 5 new high rise and mid rise buildings ranging from 112′ Office Building to the 355′, 33 story hotel/residential tower. The project has direct frontage on the Tysons Central metro station and includes a public plaza at the entrance to the metro which connects to the projects Esplanade and common plazas between the buildings. This project also creates the new Station Place road which provides a future connection to Greensboro Drive and Route 7.
FDP  2011-PR-011 Garfield 1575 Anderson Rd Pending Staff Approval 3/30/2012 7/12/2012 Not Scheduled
No information on this project at this time
FDP  2011-PR-023-02 AMT Association for Manufacturing Pending Staff Approval 2/27/2012 4/25/2012 Not Scheduled
AMT is part of the Arbor Row project Block F and is currently in review for final development plans. It includes the construction of a new 175′ office building at the existing location of the AMT.
FDP  2011-PR-023-03 Cityline Partners Pending Staff Approval 2/27/2012 4/25/2012 Not Scheduled
Arbor Row Block E is part of the overall Arbor Row project and includes two new residential/retail towers from 215′ to 300′ tall directly adjacent to the AMT building along Westpark Drive. Demolition has been completed on this site already over the past month, however it is not clear if the Final Development Plans are now approved.
RZ   2012-PR-002 Greensboro Park Property Pending Staff Approval 11/22/2011 4/25/2012 Not Scheduled
Greensboro Park Place is an infill project on the existing Greensboro Drive property along International Drive. The project proposes two new residential towers of 225′ and 245; at the intersection of Pinnacle Drive as well as proving new civic and park spaced within the existing office tower portions of the site.
FDP  2010-PR-021 Capitol One Bank Pending BoS Approval 7/1/2011 7/11/2012 9/25/2012
Capital One Bank is a project that includes several new mixed use buildings including a 280′ office tower currently under final development plan review. The project also includes a new public park and plaza at the entrance of the McLean Metro Station.
RZ   2010-PR-014D Georgelas Group Pending Staff Approval 12/5/2011 3/22/2012 10/30/2012
No information on this project at this time
FDP  2011-PR-023 Cityline Partners Pending Staff Approval 12/8/2011 6/20/2012 Not Scheduled
Arbor Row Block A is part of the overall Arbor Row project which includes 3 new mid rise and low rise residential/retail buildings and a new 225′ residential/retail tower. The project provides new public and private spaces including a plaza courtyard and is screened from the existing Avalon Crescent property by the existing vegetation and stormwater management pond.
RZ   2011-PR-023 Cityline Partners Pending Staff Approval 4/29/2011 6/20/2012 10/30/2012
The Arbor Row master plan is a multi phase project that includes several high rise and mid rise mixed use buildings. There are several new open space and street scape improvements proposed with this master plan.
RZ   2011-PR-017 MR Commons Pending Staff Approval 2/11/2011 7/6/2011 11/20/2012
The Commons of McLean project is a multi phase redevelopment of the existing residential property of the Commons of McLean which currently consists of several garden style apartments. The new residential towers range from midrise to 23 stories and includes a new recreational field. It also includes the Colshire Meadow Drive connection through the Mitre Property which will connect residents of the McLean Commons region and Pimmit Hills to the McLean Metro Stations. The project could include as many as 2160 dwelling units.
RZ   2010-PR-022 Campus Point Realty Corp Pending Staff Approval 12/22/2010 5/31/2012 11/20/2012
Solutions Plaza is a mixed use project which incompasses much of the SAIC and Booz Allen office parking along Route 7 and Greensboro Drive. The project has several phases and portions and ranges from a 9 floor to a 30 floor tower. The uses range from pure retail, to mixed use office retail as well as 3 new residential towers along Westpark Drive. The project will also connect to the station place entrance from Route 7, included with the Tysons Central project, and a new grid connection in Center Street. The project has direct frontage on the new Tysons Central Metro station and will have a large plaza entrance will pedestrian friendly retail and recreational space.
RZ   2011-PR-010 Cityline Partners Pending Staff Approval 2/18/2011 9/21/2011 12/4/2012
Scotts Run Station South is part of the overall Scotts Run Station project and includes several new high rise and mid rise mixed use buildings along Old Meadow Road, Colshire Meadow Road (the new grid connection constructed with this plan) and Colshire Drive. The towers range from a mid rise 66′ residential building to a 365′ office tower with ground level retail along Route 123. Also included with this project is a new 180′ Hotel Building and possible conference center for the growing city along Colshire Meadow Drive.